What the profit and ROI estimates include
Profit equals ARV minus acquisition, rehab, contingency, buying and loan costs, selling costs, holding costs, and interest. Loan principal is not deducted again from profit: it finances project spending that is already counted. Interest uses loan amount × annual interest assumption × holding months ÷ 12. It assumes a constant outstanding loan balance and simple interest; actual draws, compounding, amortization, and minimum-interest provisions can differ.
Cash invested is not the same as total cost
The cash-invested estimate subtracts loan proceeds from project costs before selling expenses. ROI divides estimated profit by that cash contribution and is not annualized. It does not model renovation reimbursements, peak cash required during construction, income taxes, or every settlement detail. If cash invested is zero or negative, ROI is omitted. Keep a separate cash-by-phase budget for contractor deposits and draw delays.
Use the estimate to ask better questions
Test a lower sale price and a longer holding period before committing. Use a lender’s written terms for interest, fees, and payoff conditions rather than guessing market pricing. ARV is an estimate, not a guaranteed sale. Ask about renovation holdbacks, draw timing, extension conditions, and any prepayment costs.
Common questions
How is profit calculated?
Estimated profit is resale value minus purchase, rehab, contingency, buying costs, selling costs, holding costs, and the simplified interest estimate. Add taxes and any transaction-specific costs outside these inputs to your broader project budget.
How is ROI calculated?
ROI is estimated profit divided by estimated cash invested, multiplied by 100. Cash invested is project cost before selling expenses minus loan proceeds. The result describes a simplified cash-based return for the project, rather than an annualized return.
Does the tool account for construction draws?
The interest estimate uses the entered loan balance for the full holding period with simple interest. For a draw-based loan, compare that estimate with the lender’s actual funding and payment schedule, including any minimum-interest terms.
What if estimated cash invested is zero or negative?
ROI is left blank when estimated cash invested is zero or negative because the calculation needs a positive cash contribution. Review loan proceeds, upfront costs, and holding costs, then use a separate calendar to plan cash needed before construction reimbursements.
How should I estimate ARV?
Estimate after-repair value using comparable completed sales with similar location, size, layout, and finish level. Try a second resale value and a longer holding period to see how the project’s profit changes.