How to Get a Fix and Flip Loan: Step by Step

How to get a fix and flip loan: build your rehab budget, plan draws, and prepare a strong exit. Then get matched with one lending partner free.

By 60 Second Loan Match · US-focused financing education · Updated 2026-11-19

How do you get started with a fix and flip loan?

Getting a fix and flip loan starts with a project a lender can understand: what you are buying, what must change, how much the work costs, how you will execute it, and how the debt will be repaid. Before you sign a purchase contract without adequate protections, build a complete cost and timeline view. The property’s condition, contractor capacity, local permit requirements, comparable finished sales, and available cash can all change whether the transaction makes sense.

Step 1: define the property and scope

Write down the address, current condition, planned improvements, and intended buyer when the home is finished. Distinguish cosmetic repairs from structural work, additions, or a full rebuild. Get professional inspections where needed and identify code or permit issues.

A lender may treat major construction differently from a straightforward renovation. If you intend to change the layout, add living area, or convert the use, confirm local feasibility before basing ARV on the finished concept. Confirm the intended layout, use, and construction scope with the local permitting process.

Step 2: support the after-repair value

ARV is the estimated market value after the planned repairs. Use comparable completed sales with similar location, size, condition, and features. Explain why each comparison is relevant rather than collecting only the highest sales in the area.

Use closed sales as the core evidence for completed-property value. Check whether your planned finish level matches the neighborhood and likely buyers. Ask how the lender’s appraisal will address the proposed scope. Your investment budget should remain workable if the appraised value or final sale price is below your initial expectation.

Step 3: build the full cost stack

List purchase price, acquisition closing costs, rehab, permits, utilities, taxes, insurance, loan fees, interest, holding costs, selling expenses, and contingency. Show which items the lender may finance and which you must pay yourself. Our calculator separates project cost from estimated cash invested. Use your own quote for loan interest and your own selling-cost assumption.

Step 4: choose and document the team

Bring an itemized contractor bid, timeline, relevant experience, and clear responsibilities for materials, permits, subcontractors, and change orders. If you will manage the project yourself, document how work will be scheduled and inspected. A first-time investor should be especially clear about who provides technical oversight.

Keep contractor insurance and licensing questions with appropriate local professionals. Select the contractor using relevant work history, availability, and a clearly defined scope.

Step 5: map cash by project phase

Closing funds cover acquisition expenses, while renovation holdbacks move through the construction draw process. If rehab money is reimbursed after inspections, you may need cash to pay for the first phase and later draw gaps. Create a schedule showing deposits, closing contribution, contractor payments, inspection requests, expected reimbursement, and carrying costs.

Ask about draw fees and turnaround without treating an estimate as assured. Keep reserves outside the amount already committed to purchase and construction. If partners contribute cash, document the amount and timing. A project cash calendar shows when contractor and lender payments are due and how they will be funded.

Step 6: discuss the financing structure

Give the provider the property, scope, ARV support, funds, and experience information. Ask about acquisition proceeds, rehab holdback, leverage calculation, loan maturity, recourse, extension rules, and interest treatment. Interest may be based on disbursed funds or a broader committed amount depending on the agreement.

A proposed structure may leave a closing gap if fees or holdbacks reduce available cash. Ask for a written breakdown and identify what remains subject to appraisal or underwriting.

Step 7: read the draw process before signing

Ask who orders inspections, what documents prove progress, whether lien waivers are required, whether there is retainage, and how change orders affect available funds. Clarify whether material deposits are financeable before installation. Understand what happens if work differs from the approved scope or a contractor stops.

Keep receipts, contracts, permits, and inspection records organized throughout the project. Include the cash buffer needed to keep work and scheduled loan payments moving between draws.

Step 8: work backward from the sale

Include construction, inspections, punch-list work, staging, listing, buyer negotiations, and closing in the schedule. Carry the schedule through listing, buyer negotiations, and the final closing. Review maturity, minimum-interest terms, and prepayment charges with the actual anticipated payoff date.

Keep the expected sale and payoff dates aligned with the loan’s term. A backup rental plan needs supported rent and separate refinance review. Value, rent, seasoning, and new lender criteria must all be considered.

How do you compare project scenarios?

Test a lower sale price, higher rehab expense, and longer hold. Change one input at a time to understand the effect, then combine several setbacks for a conservative view. The fix and flip calculator can estimate interest, holding expense, contingency, selling costs, profit, and cash-based ROI using your assumptions.

Use a separate schedule for draw timing and add transaction-specific costs to the full budget. Add missing items to your manual budget and verify the numbers with relevant professionals. If the project requires perfect pricing and timing to return your cash, consider renegotiating, reducing scope without harming value, or walking away rather than seeking more leverage.

Use the budget to control change orders

A contractor’s change order should show what changed, why it is necessary, the added cost, and the schedule impact. Record whether the work is inside the approved loan budget and who must approve it. If it is outside the holdback, identify the cash source before work starts.

Keep contingency separate from optional upgrades. A hidden structural issue and a nicer finish are different decisions; the first may protect completion, while the second should be evaluated against resale value. Update your total project estimate whenever scope changes instead of preserving the original profit figure on paper.

Prepare for the sale as an operating stage

Once the home is complete, expenses continue while you market it and wait for a buyer’s closing. A buyer’s inspection may create repair requests or price negotiations. Build time for documentation and title resolution, and make sure the lender receives an accurate payoff request for the actual closing date.

Keep enough cash to maintain the property during the listing period. Keep the finished home’s carrying costs in the budget through buyer closing and payoff.

Keep records that support the next project

After closing out a flip, save purchase and sale settlement records, the original and final budget, invoices, draw records, and photographs documenting work. Compare the actual holding period and net proceeds with your initial forecast. Note which assumptions were wrong and why.

That history can improve your next budget and provide honest experience evidence for future lender conversations. The useful result is what happened after every acquisition, construction, financing, holding, and selling expense was accounted for, including the cash you had to supply along the way.

What do fix and flip lenders look for?

Many lenders look at the property’s current condition, supported ARV, rehab scope, purchase economics, and the borrower’s experience and liquidity. Credit history is part of many programs, even when property value plays a major role. The lender also needs a workable sequence from acquisition through completion and payoff.

Give the lender a concise project packet with the contract, budget, contractor bid, comparable finished sales, and funds available. Include your intended completion and sale dates. If you are buying through an entity, add the ownership documents and explain who manages the project.

For a first flip, focus on the team and execution plan. Describe relevant renovation or project-management experience accurately, identify the contractor’s responsibilities, and show how work before the first draw will be funded. For an experienced investor, a brief completed-project schedule helps demonstrate the types of work you have managed.

How much cash do you need before the first draw?

Break cash needs into purchase contribution, closing expenses, contractor deposits, and work completed before reimbursement. Renovation funding can be part of the loan while still being released later through draws. Your contractor’s payment dates and the lender’s release process determine the cash you need between those events.

For a hypothetical project, a $200,000 purchase and $50,000 renovation create $250,000 in acquisition and rehab cost before other expenses. If financing covers $200,000 of those costs, the remaining $50,000 is a contribution to plan for, alongside closing and holding costs. The split between acquisition funding and rehab holdback matters as much as the total.

Make a simple calendar showing each work phase, contractor invoice, inspection, and expected draw. Add loan payments, utilities, taxes, and insurance to the same calendar. You can then see where cash needs peak and how much reserve is useful through construction and sale.

How do you present your project clearly?

Start with a short summary of the property, purchase price, planned work, and intended resale market. Follow it with the itemized budget and a schedule tied to major construction stages. This helps a lender see the project quickly before reviewing the full supporting documents.

Keep ARV evidence separate from costs. Use comparable closed sales and explain differences in location, size, layout, and finish level. The construction budget explains what you will spend; the sales evidence explains the completed property’s market position.

Finish with cash available and the proposed exit calendar. Include listing preparation, buyer inspection, and closing after work is complete. A clear presentation supports a financing discussion centered on the actual project rather than a generic request for capital.

  • One-page property and project summary.
  • Signed purchase contract and itemized rehab bid.
  • Comparable completed sales and supported ARV.
  • Contractor, draw, and cash contribution plan.
  • Timeline through the sale and loan payoff.

Things to watch for

Draws may reimburse completed work, so keep cash available for contractor deposits and the first construction phase. Allow time for listing and buyer closing before loan maturity. Review extension costs, recourse, and payoff terms alongside the renovation contingency.

Get matched

Answer a few quick questions about your financing needs with 60 Second Loan Match. It takes about 60 seconds, and a lending partner who works with this loan type reaches out to discuss your options. There is no cost to the borrower.

Ready for the next step? Learn more about fix and flip loans, then get matched with one lending partner in about 60 seconds.

Common questions

Can I start without completed flips?

Some programs consider first projects with a clear contractor, budget, and liquidity plan. Present relevant experience and the team responsible for executing the renovation.

How is ARV established?

ARV is supported by comparable completed sales and the proposed renovation. Purchase and rehab costs belong in the budget, while market evidence supports value.

Why do I need cash when rehab is financed?

Draws may reimburse work after inspection, leaving contractor deposits and early work to fund beforehand. Closing expenses and ongoing carrying costs also need a cash plan.

Can I use a rental exit instead of selling?

A rental exit needs supported rent and a workable permanent-financing plan. Review completed condition, seasoning, value, and net refinance proceeds before building it into the schedule.

What does the flip calculator estimate?

It estimates project costs, simple interest, profit, cash invested, and cash-based ROI from your inputs. Add taxes and any omitted transaction-specific costs to your broader budget.

Explore financing options

Run your numbers

Related guides

This is general information, not financial advice. Program requirements and loan terms vary. Consult an appropriate professional about your circumstances.

Ready to discuss your financing?

Answer a few quick questions and connect with a lending partner to discuss your options. Free to use, with no obligation.

Get matched in 60 seconds

Want to become one of our lending partners?

Get exclusive, verified borrower requests delivered to your inbox in real time.

Become a Lending Partner